On the other hand there are hydro vents and drains which function is to provide proper hydro testing and pipe draining.
Hydrostatic vents and drains.
Purpose of hydro high point vents is to expel air during hydro test.
Pnf0307 v d 07 hydrostatic test vents and drains welded piping nps 2 and up with pipets and lap joint flanges.
Drain note 1 note 3 note 1note 3 note 1 note 2 note 2 note 2 or t i on top of pip e pipin g h yd r o test ven ts an d d r a in s typic al lo c ation a p p lic a b l e t o a ll p ip in g s u b je c t t o h yd r os t a t ic le a k t e s t.
1 for line size 16 and larger.
Check open and closed position of all valves.
Vents and drains shall be closed with a blind flange or a threaded cap plug as provided in the relevant piping class.
But it will be vary depends on the fluid project and client.
Pnf0308 v d 08 hydrostatic test vents and drains welded piping nps 3 4 1 1 2 with weld neck flanges.
After hydro test is done pipe is drained thru low points drains by gravity.
Check for proper installation of vents and drains.
Normally size of test vents and drains shall be.
Hydro testing required that all air must be expelled and pipe must be completely and absolutely fill with water.
Verify chloride content of test water when testing stainless steels.
An in line sewer video camera is used in the process to assist with the placement of test balls throughout the system and to map out the layout of the sanitary sewer system.
Inflatable test balls are inserted into the system through existing cleanouts roof vents and exposed toilet drains to perform a hydrostatic test on an isolated portion of the sewer system.