Input length width and depth of the area.
I need cement poured.
Rain is not simply equivalent to gently sprinkling water over concrete surface.
Available from diy stores and ready mix concrete companies these contain soluble emulsions that form a protective film when sprayed directly onto the surface of newly poured concrete slabs or walls.
Estimate a concrete order.
Use the following yields per each bag size.
It strikes concrete surface with a force.
This calculator is to be used as an estimating tool only.
I am a concrete hobbyist.
If rain falls immediately after pouring it will ruin the surface nothing serious is going to happe.
40 pound bag yields 011 cubic yards.
We ll use a 10 x 10 ft.
Essentially you are solving for volume and then converting to cubic yards.
The formula for cubic yards is this.
Here s a brief rundown of what you need to know about concrete and concrete prices.
Length x width x thickness.
To determine how many bags of concrete you will need divide the total cubic yards needed by the yield.
Multiply the length 10 ft by the width 10 ft by the depth 35 ft or 4 in and divide it by 27.
Calculate the volume of concrete you need in cubic yards.
Calculate the volume you need in cubic yards.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
Multiply the length 10 ft by the width 10 ft by the depth 35 ft or 4 in and divide it by 27 the number of cubic feet in a cubic yard.
How much to pour a concrete slab.